The 25mm thick weighty steel tube is driven With all the finish closed by a steel shoe. On reaching the required driving resistance, a full length cage is lowered in into the tube and filled with high slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupiles95173.blogaritma.com/30982262/the-single-best-strategy-to-use-for-cast-in-situ-piles